Progress and Goals
Current plans and workload overview:
(will update with some exact numbers soon, aswell as update some of the links)
Green: finished
Orange: working on it right now Red: needs orange areas completed in order to continue/start No color: current priority low blue: links ______________________________________________________________________________________________________________________ Overall Workload (WIP) current whole length of the Highway: 721 targeted wideness of Highway: 3 Tiles (excluding buffer tiles needed) height on highest point, from lowest point of Magranon's Scar: 7558 In Partitions Speedway North: length: 198, cur. height: 6014 , targeted height: 3940 buffer height needed(top): 2074, buffer tiles needed: 10 (or 7 if all buffer on 300 slope) Diagonal North: length: 52, target height flat with north Highway top cur. slope difference to north speedway: 405 Center straight: length: 125, max height of the scar is defined by gurubear road connection 7558 slopes and 396 tiles total from south and 7010 slopes and 325 tiles in total from north Diagonal South: length: 26, target height: flat with south Highway top cur. slope difference to south speedway: -232 Speedway South: length: 320, cur. height: 7143, targeted height: 6460 buffer height needed(top): 831(683 if current 4th tile (152 slope) is mined down to 300) buffer tiles needed: 4 (on 300 slope) update: cur.height: 6843, targeted height: 6320, 523 height need to be mined down from top ______________________________________________________________________________________________________________________ A: Gate (4 flat tiles on both sides same height) Milestones: not started: North-gate-museum-towers on North end of the Highway, with bridge connecting them ______________________________________________________________________________________________________________________ A-B: North Highway Ramp, 153 tiles long at 20 slope each current height difference: xxx, target height: xxx Milestones: complete: speedramp to access the scar at point B () not started: 20 sloped North Ramp ______________________________________________________________________________________________________________________ B: North flat corner (), colossi, inn (The Sleeping Hellhound) and a ramp to it Milestones: started: North Highway Buffer (see the 360° view and/or the Picture Gallery) complete: Inn platform (view jan'14 / View mar'14) complete: the Inn to the sleeping Hellhound () passable: Ramp to access the Inn () not started: colossi ______________________________________________________________________________________________________________________ B-C: 55 tiles north diagonal () Milestones: started: North Diagonal (Sideview & Topview) () ______________________________________________________________________________________________________________________ C: Flat corner: north diagonal - center (), connection between north diagonal and center highway Milestones: started: mine flat together with surrounding highway ______________________________________________________________________________________________________________________ C-D: Highway straight-flat part (), Scar to Gurubear crater connection () Milestones: complete: Scar center straight part passable started: mine down and expose to rock complete: scar to gurubear crater connection ______________________________________________________________________________________________________________________ D: Flat corner: center - south diagonal () Milestones: started: mine flat together with surrounding highway ______________________________________________________________________________________________________________________ D-E: South diagonal (), 26 tiles long Milestones: >>>current workarea: dirting for paving complete: first buffer layer done, adjecant to south flat complete: has reached it's target height, including a side road to "Scar's Brewery" ______________________________________________________________________________________________________________________ E: South flat corner 3x3 () Milestones: >>>current workarea: waiting for paving and dirting complete: new south working station complete: first buffer layer is done 523 still to go complete: at target height ______________________________________________________________________________________________________________________ E-F: South Highway Ramp, 250 tiles long at 20 slope each (down) current height difference: 831, target height: 6460 Milestones: complete: (now) old speedramp to access the working sites from the south (view) () complete: make new Speedway passable () complete: get dirt for raising bottom of the speedway to finish new speedway complete: has reached final height at the start of it, bridge build over >>>current workarea: reforest and reshape old speedway into a natural state >>>current workarea: tunnel and mine the final highway slope down including sloping the buffers ______________________________________________________________________________________________________________________ F: Connection from Scar to old Boondocks highway (), Gate (4 flat tiles needed on each side of the highway or infront of the highway) Milestones: complete: close Mineshaft complete: flat tiles for gate not started: South-gate-museum-towers on North end of the Highway, with bridge connecting them ______________________________________________________________________________________________________________________ |
More pictures on the official "Gallery"
360° Views directlinks: (will require the microsoft Silverlight plugin)
Point B Jan20-2013
Point B Mar18-2013
Point B Mar30-2013
Point B Dec04-2013
Point B Feb11-2014
Sleeping Hellhound Platform Feb11-2014
Path to the Inn Mar21-2014
Segment C-D Dec26-2013
________________________________________________________________________________________________________________________________________________________________
embedded 360 Views:
Point B Jan20-2013
Point B Jan20-2013